Project: numerical control machine tool still under operation when splitting work 

The job refer demolition of 0.5m*0.5m reinforced concrete stanchion in factory, but it's require no influence production of workshop when process of demolition, furthermore it can't intermit the numerical control machine tool operation. That's say there must have no dust, no flying chipping and no shake, therefore workman use core drill to drill hole with dust and shake free. Then using one hydraulic splitter with electromotor power pack split stanchion into big piece from top to base, there is vibration free, dust free and noise free in whole process, thereby all machines of factory under normal operation and production. Finally, using forklift transit big piece reinforced concrete.
 